- Q1-2011 production 5,200 BOE/d (33% oil & liquids)
- Q1-2011 eight (7.9 net) wells drilled
- 2011 budget capital $68MM
- > 275 identified locations
- > 80 vertical wells and approximately 70 horizontal multifrac wells drilled to date
- Donnelly Gas Plant current sales approximately 23 MMcf/d
- Low operating costs of <$1.00/Mcfe
- Low capex of $1.3 MM/well
- High netback, liquids rich gas (oil & liquids recovery over 17 Bbl/MMcf)
- Positive results continue to come in from emerging Montney oil project
- Expansion to gas project requires commodity price improvement

Eastern Montney - Oil
- Emerging Montney oil project
- Eight wells drilled to date
- Average wells on at >200 BOE/d (75% oil)
- 14 additional horizontal locations in the first phase development of the first pool
- Additional, similar accumulations exist along trend on Galleon landnd, on Galleon land